2022.04.07Opened Covid-19 aftermath recovery clinic Covid-19 outpatients face-to-face treatment center opened
2022.01.10Designated as hospital in special medical tourism zone in Seogu, Busan city
2021
2021.12.27Conducted home treatment for COVID-19 patients
2021.11.29Award certificate from the National Assembly Health and Welfare Committee Chairman
2021.09Busan Adventist Hospital 70th Anniversary Finished nationally designated project of negative pressure ward and opened infectious disease hospital Expanded the amount of beds from 273 to 286
2021.08Introduction CT & ANGIO equipment Opened angiography laboratory (ANGIO)
2021.071 Grade in Pneumonia Adequacy evaluation 4 times in a row
2021.03.02Busan city mayor citation on the 55th Taxpayer's Day
2021.01.12Award certificate from the Director of Korea Disease Control and Prevention Agency for Korea National Hospital Discharge Injury Survey in 2020
2021.01.05Remodeling of respiratory clinic completed
2020
2020.12.02Opened Cambodia Telemedicine Center
2020.11.24Selected as participante of national project for organization negative pressure bed wards.
2020.10.15Got 3rd medical institution accreditation
2020.09Establishment of Thoracic Surgery
2020.08.23Parking tower construction completed
2020.05.06Award certificate from Busan Metropolitan City
2020.03.17Building C 2nd floor remodeling completed
2020.02.29Designated as National Covid-19 Safety Hospital
2020.02.13Permission to reduce amount of beda from 293 to 273
2020.02.06600 ward remodeling completed
2020.01.22500 ward remodeling completed
2020.01.07300 ward remodeling completed
2019
2019.12.24Got award certificate from the Minister of Health and Welfare
2019.12.18Inauguration ceremony of public-private consultative agency promoting special medical tourism zone in Seogu area.
2019.10.29Permission to expand amount of beds from 270 to 293
2019.09.23Conducted the 5-th event "Let's share our love with residents of Seo-gu area"
2019.07.31Opening of a new building for 620 wards (integrated care wards)
2019.07.02Completion of the reconstruction of the director's office
2019.07.01Establishment of a department for the detection of lung cancer
2019.07Extension of 41 wards, closing of 39 wards out of 720
2019.06.20Completion of the 9th floor extension in the new building
2019.06.10Completion of the construction of a special parking lot at Busan Sam Yuk Hospital
2019.06.01Implementation of Hologic-Horizon Wi
2019.05.09Completion of the preparation of the rehabilitation center on the 8th floor of the new building
2019.04.15Opening of the International medical center
2019.04.09Opening of the Neurological center (complex center for senile diseases)
2019.03.01Opening of the emergency department
2019.02.18Implementation of the disposable digital flexible endoscope
2019.02.12Implementation of OLYMPUS EVIS EXERA III
2019.01.02Opening of the Pain management clinic
2018~2016
2018.06.01Opening of the Center for combating the excess weight
2018.04.10Completion of the restructuring of the Department of Pediatrics
2018.03.01Establishment of the Endocrinology department
2018.02.01Opening of the cancer center
2017.11.01Expansion of the Comprehensive Nursing Unit (3rd floor of Building C)
2017.11.01Adding 287 hospital beds
2017.03.02Establishment of the Department of Special Examinations
2017.03.02Establishment of the Department of Pulmonology
2016.10Conducting the 2nd event "Let's share our love with residents of Seo-gu area"
2016.08Obtaining the 2nd certificate from the Ministry of Health and Human Services.
2016.08.01Opening of the Oncology Department
2015
2015.10.19Hosting the event "Let's share our love with residents of Seo-gu area”
2015.09.01Organization of integrated nursing wards (5th floor of the main building)
2015.06.12Establishment of National Security Hospital MERS
2015.05.01Expansion from 270 to 285 hospital beds at Busan Adventist Hospital
2015.04.28Opening of the Oncological pain treatment department
2015.02.01Expansion from 235 to 270 hospital beds at Busan Adventist Hospital
2015.02.01Opening of the 3rd floor in the main building
2015.01.16Completion of the reconstruction of the outer wall of the hospital
2015.01.02NEW HI and VISION ceremony
2015.01.01Change of name to “Busan Adventist Hospital”
2013~2014
2014.06.19Opening of the Dry Eye Treatment Center
2014.06.12Opening of the Rehabilitation Center
2014.06.01Opening of the Department of Rehabilitation Medicine
2014.06.01Opening of the Department of Vascular Diseases Treatment
2014.03.01Choi Myungsop, M.D., appointed as the 20th president of the hospital
2013.11.01Closing of the Oriental Medicine of Adventist Hospital, opening of the Oriental Medicine Department at Busan Weesaeng Hospital
2011~2008
2011.05.11Completion of the reconstruction of the Skin Plastic Surgery Clinic. 274.22 m²
2010.12.31Expansion from 230 to 235 hospital beds
2010.01.14Completion of the reconstruction of Outpatient Appointment Rooms
2009.10.Expansion of the Comprehensive Health Examination Center
2009.09.14Completion of the reconstruction of the Dentistry Department
2008.09.12Completion of the reconstruction of the Postpartum Care Center
2008.05.26Completion of the reconstruction of the Comprehensive Health Examination Center
2008.04.04Completion of the construction of the parking lot
2005~2001
2005.12.16Expansion from 250 to 260 hospital beds
2005.10.02Completion of the renovation of the main building (5207 sq. m in total, including outpatient room, waiting room, operating room, ward, main staircase, entrance to the intensive care unit, etc.)
2005.09.05Integrated medical information system (OCS, PACS, EMR) operation
2004.05.01Opening of the Department of Neurology
2002.11.21The hospital is designated as a training hospital of the oriental medicine (for general practitioners)
2002.11.01Installation and operation of the magnetic resonance imaging system and computed tomography system (MRI-CT).
2002.03.03Pastor Seo Gwansu was appointed as the first president of the Oriental Medicine Hygiene Hospital.
2002.03.03Opening of the Oriental Medicine Hygiene Hospital (17 wards, 50 beds)
2001.08.09Expansion from 250 to 280 hospital beds
1990 – 1999
1999~1994
1999.12.22Completion of construction of an additional Postpartum Care Center (692.970 sq. m.)
1999.12.22Completion of the construction of the adjacent kindergarten (340.020 sq. m.)
1999.12.22Completed construction of a new building (5,027.69 sq. m)
1997.12.31Reduction from 300 hospital beds to 250
1994.04.01Commissioning of the central hall of computer equipment
1994.03.13Completion of construction of housing for employees
1994.02.07Permission to open a family medicine department
1993~1991
1993.07.11Beginning of construction of housing for employees
1992.12.30Purchase of the nursing dormitory building
1991.12.22Pastor Jung Yonggeun was appointed as Deputy Head of the 12th Hospital
1991.10.01Establishment of the Dental Training Clinic
1991.04.07Expansion and completion of the restaurant on the 7th floor (637 sq. m area)
1980 – 1989
1989~1985
1989.05.25Completion of the construction of the operating room, maternity ward and the neonatal ward (154 pyong area)
1987.10.14Obtaining permission to expand from 200 hospital beds to 300 hospital beds
1985.11.30Designation of the hospital as a training hospital for interns and residents
1985.10.05Completion of the construction of the extension (1496 sq. m) and the Hemodialysis department (1469 sq. m)
1985.01.28Installation and operation of magnetic resonance computed tomography (MRI-CT)
1984~1982
1984.11.30Obtaining hospital status with an independent internship program
1984.10.02Permission to open psychiatry, urology and ophthalmology departments
1984.09.11Permission to open a neurosurgery department
1984.03.26Permission to expand from 100 beds to 200 beds
1983.02.16Jung Haeun was appointed as director
1982.03.18Permission to expand the departments of anesthesiology, otolaryngology
1981~1980
1981.09.21Permission to open a general hospital
1981.05.03Expansion of the dentistry department
1981.03.17Designation of the hospital as an educational institution for teaching obstetrics
1981.01.21Completion of the construction of an administrative office on the 3rd floor (228 sq. m)
1980.03.17Designation of the hospital as an educational institution for interns
1970 – 1979
1979~1977
1979.11.01Completion of construction of dormitory for nurses (396 sq. m)
1979.04.01Beginning of construction of dormitory for nurses
1978.07.01Expansion of the orthopedic department
1978.01.01Permission to expand from 39 hospital beds to 100 hospital beds
1977.10.01Dr. Jung Haeun was appointed as Deputy Director
1977.10.01Completion of the construction of the extension of the new building
1976~1970
1976.10.01Start of work on the expansion of the hospital (2726 sq. m, new building)
1975.01.01Completion of construction of houses for hospital personnel (3 floors, 587 sq. m each)
1970.04.01Completion of the extension of the main hospital building (475 sq. m)
Before 1970
1965
1965.11.01Permission to open a Therapeutics Department, a pediatrics department and a department of obstetrics and gynecology
1965.02.01Completion of the construction of the dining room (198 sq. m)
1957~1951
1957.07.01Expansion of the territory and the beginning of construction of church halls and houses for personnel
1955.04.15Completion of the main building construction, opening and operation of the Seoul Weesaeng Hospital branch (later renamed to Busan Weesaeng Hospital )
1954.04.01Start of construction of the new main hospital building (2 floors, 832 sq. m)
1953.03.01Purchasing a building for a hospital
1951.03.15Opening of Busan Branch of Seoul Weesaeng Hospital